Industrial capacity. Digital control.
Where approved design becomes predictable production.
ERGIO connects production-ready 3D detailing, ERP planning, automated panel assembly and multi-axis timber processing inside one controlled manufacturing workflow — built for custom, serial and large-scale B2B projects.
A commercial advantage, not a showroom claim
The factory is designed to reduce uncertainty before materials reach site.
For a contractor or developer, technology matters only when it creates a more reliable project: defined components, repeatable batches, controlled revisions, organised packing and fewer decisions left for the construction site.
ERGIO does not replace the project architect or structural engineer. We transform approved architectural and structural information into production-ready models, machining instructions, panel data and coordinated kits that can be manufactured, checked and delivered in a planned sequence.
Follow the production flow ↗


The digital thread
One controlled route from project information to identified components.
Each layer has a different role: planning controls capacity and revisions, detailing defines every component, and machinery executes the approved production data.
ERP production control
Plan the work before the machines need it.
Production planning coordinates confirmed projects, procurement, factory capacity, deadlines and dispatch requirements. Revision control is essential: the factory must manufacture the approved version, not simply the latest file received by email.
- Project and batch scheduling
- Material and procurement visibility
- Production-status tracking
- Delivery planning and completion checks

Cadwork CAD/CAM
Every member and machining operation defined in three dimensions.
Approved architecture and structural information are converted into a manufacturing model compatible with the factory workflow. Openings, junctions, components, material lists and machine operations are coordinated before production begins.
- IFC, DWG, Cadwork and other 3D CAD inputs
- Production detailing and acceptance drawings
- Component numbering and material lists
- Direct transfer of manufacturing information

MobiOne panel line
Repeatable timber-frame elements assembled under factory conditions.
The MobiOne line supports the production of timber-frame panels up to 6 m, using laser alignment, pneumatic tools and touchscreen-controlled workflows to improve speed, accuracy, consistency and operator safety.
- Wall-panel geometry and framing
- Controlled alignment of elements
- Repeatable unit types and serial batches
- Preparation for selected boards and envelope layers

Hundegger ROBOT-Drive 450
Complex processing executed from CAM-controlled data.
The 5-axis machine rotates members through 360° and uses 16 integrated tools to perform cutting, drilling, slotting, profiling, marking and labelling operations for posts, beams, rafters and custom structural components.
- Structural timber processing
- Connection pockets, slots and drillings
- Complex angles and custom geometry
- Marking and component identification

Quality & completeness
The project is checked as a coordinated package — not a pile of parts.
Checks are performed throughout production and before dispatch. The purpose is to confirm material, geometry, component identification and package completeness against the approved production information.
- Incoming material and moisture checks
- Dimensions, geometry and machining review
- Panel, opening and interface checks
- Labels, packing lists and dispatch completeness

Technology with a defined purpose
Different equipment for different levels of factory completion.
The same project can require panel assembly, precision timber machining, treatment or a combination of processes. ERGIO configures the production route around the agreed supply package.

MobiOne
Factory assembly for timber-frame panels up to 6 m, with laser alignment, pneumatic tools and controlled operator interfaces.
- Best suited to
- Walls and repeated panel geometries
- Commercial value
- Consistency across serial and multi-unit programmes

Hundegger ROBOT-Drive 450
Five-axis processing for beams, columns, rafters and custom timber members.
- Operations
- Cutting, drilling, slotting, profiling, marking and labelling
- Control
- CAMBIUM production software

SCHOLZ autoclave treatment
Pressure treatment can be specified where the timber application requires increased resistance to moisture, biological factors or ground-contact conditions.
- Selected by
- Species, use class, exposure and project specification
- Confirmed per order
- Treatment system, colour, penetration and documentation

Cadwork & digital detailing
Production-ready models connect approved project geometry with component data, material lists and machine operations.
- Inputs
- IFC, DWG, Cadwork and other professional CAD formats
- Outputs
- Acceptance drawings, production models and machine data
Factory workflow
Eight controlled transitions from approved information to site-ready delivery.
The exact route changes with the system and supply package, but responsibility, revision status and production readiness must be clear at every transition.
Approved inputs
Architectural documentation, structural design and scope supplied by the professional partner.
Production review
Geometry, interfaces, materials, logistics and manufacturing constraints are analysed.
Acceptance drawings
Project decisions and revisions are confirmed before detailed production work.
Production detailing
Every component, panel and machining operation is defined in the 3D model.
Material preparation
Certified inputs are received, checked and allocated to the approved production package.
Manufacturing
Panels, beams, profiles and special components follow their assigned production route.
Quality & packing
Components are checked, identified and grouped around the agreed site sequence.
Dispatch & support
Loads are coordinated with delivery, erection and technical assistance requirements.
Quality & traceability
Control the inputs, the process and the completeness of the package.
Quality is built through defined specifications and documented checks — not added at the end. Material class, visual expectation, moisture, processing, identification, packaging and contractual acceptance criteria must be agreed for each project.
Certified structural timber
Fir or spruce from Nordic countries and Romania, with C24 and FSC/PEFC-certified supply options according to the selected product and order requirements.
Incoming material checks
Material documents, visible condition and relevant moisture or dimensional criteria are checked before processing.
Production verification
Geometry, openings, machining operations, interfaces and identification are reviewed against the approved production information.
Pre-dispatch completeness
Package contents, labels, packing lists and load sequence are checked before the materials leave the factory.
Specific declarations, certificates, performance classes and third-party documentation are confirmed for the material and product supplied under each contract.
One factory. Multiple outputs.
The production route changes with what your project needs to receive.
ERGIO can manufacture a complete coordinated kit, selected prefabricated elements or individual processed components, depending on the professional partner's procurement and site strategy.

Timber Frame Kits
Walls, floors, roofs and project-specific envelope packages.
Explore system ↗
Post & Beam Kits
Machined members, custom connectors and coordinated structural packages.
Explore system ↗
Log House System
Solid, laminated or insulated double-wall timber building kits.
Explore system ↗Factory-to-site logistics
Production is not complete until the package is usable on site.
For large and serial projects, the order in which components arrive can be as important as the way they are manufactured. ERGIO coordinates identification, packing and dispatch around the agreed construction sequence.
- Packed by building, unit, phase or erection zone
- Component labels coordinated with production drawings
- Long-member and project-specific transport planning
- Assembly by ERGIO or partners, subject to availability
- Video, telephone or on-site technical assistance


Visit ERGIO
See the workflow before entrusting us with a large programme.
For developers, general contractors, architects, timber specialists and distribution partners, a factory visit can combine commercial discussion, production review and an examination of current manufacturing capabilities.
- Location
- 233 Cireșoaia Street, Vermești, Comănești, Bacău, Romania
- Recommended for
- Qualified B2B projects, framework agreements and recurring component supply
- Visit format
- Commercial meeting, technical workflow review and guided production tour
Factory FAQ
Questions from production and procurement teams.
Final capacity, lead time, tolerance, material availability and factory scope are confirmed only after technical review of the project documentation.
Can ERGIO reserve production capacity for a phased or serial project?+
Yes. Capacity planning can be discussed for confirmed programmes and framework agreements. The reservation structure depends on accepted drawings, production release dates, material procurement, contractual milestones and the agreed batch sequence.
Does ERGIO perform the structural calculation?+
No. The project's structural design and calculations are supplied and assumed by the partner's structural engineer. ERGIO reviews the approved information, can propose value-engineering options, and develops the production-ready model and manufacturing data.
Which project files can the production team receive?+
ERGIO can work with IFC, DWG, Cadwork and other professional 3D CAD formats. PDF drawings, material schedules and structural calculations should accompany the model where relevant. The exact handover package is agreed at project start.
Can the same factory produce panels, beams and custom components?+
Yes. A project may combine MobiOne panel production, Hundegger machining, Log House profiles and manually prepared specialist elements. The manufacturing route is configured around the agreed kit and responsibility matrix.
How is production capacity communicated?+
Capacity is communicated against the reviewed project, not as a universal square-metre promise. Geometry, package depth, materials, finishing operations, batch size, factory loading and delivery sequence all influence the confirmed output and lead time.
Can professional partners visit the factory?+
Yes. Qualified B2B partners can request a commercial and technical factory visit. The agenda can include project review, production-flow presentation, machinery, quality checks and logistics planning.
Bring a production-ready opportunity
Let us review the project, required factory scope and target delivery programme.
Send the approved or advanced-stage documentation. Our team will analyse the production route, material package, capacity requirements and next commercial steps.
- General contractors
- Developers
- Architects & engineers
- Timber construction companies
- Distributors
Discuss production.
Large, serial, technically complex and recurring B2B enquiries receive priority.