Long-span timber packages for professional operators and contractors

Large spans. Robust packages. Industrial timber precision.

ERGIO delivers Post & Beam structural kits, timber-frame envelope elements and coordinated timber packages for industrial halls, warehouses, agricultural buildings, equestrian facilities and processing or storage projects across Europe.

Explore Building Types
Approved Structural BasisProduction DetailingLong-Span ManufacturingSequenced Site Delivery
015-axis

Robotic timber processing for complex cuts, drillings, slots and connection geometry.

02Project-specific

Member dimensions and material grades are confirmed against structure, machining, handling and transport.

03360°

Member rotation on the Hundegger ROBOT-Drive 450 supports multi-face processing from controlled CAM data.

04Europe-wide

Transport, partner assembly, ERGIO assembly and technical site-support options.

Project-specific confirmation

Spans, member sections, fire strategy, durability, warranty, capacity, pricing and lead times are confirmed only after review of the complete architectural and structural documentation. Structural calculations remain the responsibility of the partner’s appointed engineer.

An industrial package shaped by the building’s operation

Build the timber scope around use, exposure and site reality.

Industrial and agricultural projects are defined by more than floor area. Clear spans, internal height, equipment, loads, wash-down regimes, humidity, openings, vehicle movement and construction sequence all influence the structural system and the way it should be manufactured and delivered.

Structure
Geometry follows operation.

The structural engineer defines the system around spans, loads, equipment, bracing, fire requirements and future adaptability.

Durability
Exposure drives specification.

Material grade, visible quality, treatment, detailing, moisture protection and replaceable interfaces are agreed against the use environment.

Delivery
Logistics starts before production.

Member length, route restrictions, lifting strategy, temporary stability and installation order influence package design and release.

Interior of an industrial timber hall with repeated roof trusses and bracing
Close-up of a machined timber beam and brace connection
Coordinated industrial deliveryFrame, interfaces, components and site sequence considered together.

Building types

One production platform. Different operational demands.

ERGIO adapts the manufacturing package to the approved structural design, required envelope, exposure conditions, logistics and assembly strategy.

Industrial & production halls

Long-span structures coordinated around equipment and workflow.

Post & Beam systems can create efficient structural grids while retaining the flexibility required for production areas, workshops, service spaces and future internal adaptation.

  • Clear spans and structural grids
  • Equipment and loading interfaces
  • Large doors and service openings
  • Fire and compartmentation strategy
  • Timber-frame enclosure elements
  • Phased manufacturing and erection
Explore Post & Beam
Warehouses & logistics

Repeatable bays, controlled components and planned site access.

Warehouse projects require close coordination between structural geometry, loading zones, vehicle movement, large openings, envelope interfaces and the order in which long members reach the site.

  • Repeatable structural bays
  • Loading and access coordination
  • Long-member transport review
  • Roof and façade interfaces
  • Package identification by zone
  • Assembly and temporary stability planning
Explore Site Readiness
Agricultural & equestrian

Timber systems specified for demanding use environments.

Farm, livestock, equestrian and equipment buildings require a project-specific approach to ventilation, moisture, cleaning, material exposure, replaceable components and protection at vulnerable interfaces.

  • Livestock and farm buildings
  • Equestrian halls and shelters
  • Machinery and equipment storage
  • Ventilation and moisture coordination
  • Treatment and visible-quality options
  • Robust, replaceable interface details
Processing & storage

Structural packages integrated with operational zones and environmental control.

Processing and storage facilities may combine large clear areas with enclosed technical zones, controlled temperatures, demanding service routes or mixed structural systems.

  • Processing and packing spaces
  • Dry or controlled storage
  • Mixed Post & Beam and panel systems
  • Service-zone coordination
  • Defined material exposure classes
  • Phased expansion strategies

Design basis

Six decisions that shape the manufacturing package.

ERGIO converts the approved design into machine-ready models and components. Before that release, the project team must coordinate the operational, structural and environmental assumptions that affect every member and interface.

01Span, height & loads

Clear geometry, roof form, imposed loads, equipment, suspended services and future flexibility.

02Fire strategy

Required resistance, member sizing, protection strategy, compartments and connection detailing.

03Exposure & durability

Humidity, wash-down, biological or chemical exposure, treatment and inspection access.

04Envelope behaviour

Thermal target, condensation control, membranes, ventilation, façade and roof interfaces.

05Equipment interfaces

Openings, service routes, supports, doors, barriers, foundations and operational clearances.

06Transport & erection

Member length, route, lifting points, crane reach, temporary stability and erection sequence.

Durability & environmental exposure

Specify the timber for the environment it will actually face.

Treatment is not a substitute for correct design. Durable performance depends on material selection, moisture management, ventilation, drainage, protection from splash zones, inspectable connections and maintenance access. ERGIO manufactures to the approved project specification and can provide treatment options where contractually defined.

Explore quality control
01Controlled internal environment

Industrial halls or storage spaces with defined humidity, protected interfaces and managed building-envelope performance.

02Variable humidity

Projects requiring careful vapour control, ventilation, drainage, detailing and moisture-resistant material selection.

03High-use agricultural zones

Robust and inspectable details, protected bases, replaceable components and project-specific treatment requirements.

04Visible structural timber

Industrial or visible-quality structural timber, coordinated appearance criteria and protection through transport and assembly.

Supply packages

Choose the level of coordination your project needs.

The final package is defined against the approved scope, local interfaces, site programme and responsibilities of the contractor and design team.

01

Structural Frame Package

For contractors requiring the engineered timber frame and connection package.

  • Production engineering
  • Project-specific structural timber members
  • CNC and robotic machining
  • Custom metal connectors
  • Fixings, identification and packing
  • Transport planning
03

Integrated Site Package

For complex or phased projects requiring broader coordination through delivery and assembly.

  • Custom multi-system package
  • Production and call-off planning
  • Long-element logistics
  • ERGIO or partner assembly options
  • Remote and physical site support
  • Corrective-action coordination

Standard ERGIO scope does not include architectural design from zero, structural calculations, permits, MEP installations or complete interior finishes.

From enquiry to erection

Release long-span components only after the interfaces are controlled.

Industrial projects benefit from early review, but detailed price and production release require coordinated documentation, an approved structural basis and a realistic site logistics plan.

01Project Submission

Architecture, structural documents, operational requirements, programme and site information.

02Technical Review

Manufacturing feasibility, member limits, interfaces, package definition and commercial assumptions.

03Acceptance Baseline

Coordinated drawings, approved geometry, materials, connections and revision status.

04Production Detailing

Every member, machining operation, connector, reference and machine file prepared for release.

05Manufacturing & QC

Material checks, CNC processing, first-piece verification, identification and package completeness.

06Delivery & Assembly

Route, loading, crane, site readiness, erection sequence and support coordinated before dispatch.

Responsibility matrix

Clear boundaries protect programme, cost and compliance.

The contractual matrix defines who approves the structure, performance, interfaces, local compliance, production information and site execution.

Operator / General Contractor

Defines use and controls delivery.

  • Operational brief and equipment
  • Procurement and programme
  • Site, foundations and access
  • Local permits and statutory process
  • Crane, unloading and safety
  • Coordination of other trades
Architect / Structural Engineer

Defines and approves the design basis.

  • Architecture and performance intent
  • Structural design and calculations
  • Loads, bracing and stability
  • Fire, thermal and durability criteria
  • Connection design basis
  • Approval of coordinated changes
ERGIO

Translates approved information into production.

  • Manufacturing feasibility review
  • Acceptance and production models
  • Piece-level detailing and machining
  • Components, kits and agreed materials
  • Identification and quality controls
  • Transport, assembly and site support options

Programme planning

Reserve capacity around approved releases—not assumptions.

For large halls, repeated bays or phased agricultural programmes, ERGIO can plan manufacturing windows and deliveries around the project schedule. Capacity is reserved only after the technical scope, approved baseline, commercial terms and call-off logic have been agreed.

Batch productionPhased releaseLong-member logisticsAssembly options

Industrial evidence

Manufacturing precision visible from component to site.

Reference imagery illustrates ERGIO’s capabilities in long-member processing, structural assembly and prefabricated building elements.

Repeated timber roof trusses spanning an industrial hall
Structural assembly

Long members, coordinated connections and controlled erection sequence.

Explore projects ↗
Detail of a timber truss connection and machined structural members
Connection precisionMachined timber joints and clearly resolved structural interfaces.
Large timber beam intersection within an industrial roof structure
Long-span frameRepeated timber geometry creating a controlled industrial roof structure.

Industrial & agricultural FAQ

Questions to resolve before releasing a long-span package.

Final scope, member capacities, treatment, warranty, production timing and commercial conditions are confirmed contractually for each project.

Does ERGIO perform the structural design and calculations?+

No. The partner’s appointed structural engineer supplies and assumes the structural design and calculations. ERGIO reviews manufacturability and converts the approved information into production-ready models and components.

What clear spans can ERGIO manufacture?+

The achievable span is determined by the structural engineer and depends on loads, geometry, material, fire requirements and connection strategy. ERGIO confirms whether the resulting members fit its manufacturing, machining, handling and transport capacities.

Can ERGIO supply treated timber for agricultural environments?+

Treatment options can be included when defined by the approved specification and contract. Correct durability also depends on design, ventilation, moisture control, protected interfaces, drainage, inspection and maintenance.

Can the package include insulation, membranes and cladding?+

Yes. ERGIO can coordinate selected envelope materials, timber-frame elements, boards, membranes, insulation, cladding and joinery according to the agreed package. MEP installations and complete finishes are outside the standard scope.

Can long structural timber elements be transported across Europe?+

Yes, subject to project-specific review of member length, vehicle type, route, permits, access, turning radius, unloading, crane position and site storage.

Can ERGIO assemble the structure?+

Assembly may be completed by ERGIO, a local partner or the contractor’s team, depending on country, programme, site conditions and availability. Remote and physical technical support can also be agreed.

Start an industrial project

Send the structural basis, operational brief and site constraints.

ERGIO will review the manufacturing fit, package boundaries, required clarifications and information needed for a detailed technical and commercial proposal.

Production hallsWarehousesAgricultural buildingsEquestrianProcessingStorage
Professional B2B enquiry

Coordinate the timber package before long-span assumptions reach production.

Best suited to professional teams with developed architecture, an appointed structural engineer and defined operational requirements.

ergio@ergio.ro+40 234 374 131

Step 1 of 4 · Organisation

Step 2 of 4 · Building

Step 3 of 4 · Documentation & scope

Information available
Required ERGIO scope

Step 4 of 4 · Contact

Professional document request

Request industrial building resources.

Identify your organisation, building type and project stage. ERGIO will confirm the documents relevant to your technical evaluation and send them to the business email provided.